Difference between revisions of "Talk:Ore Mine"

From Starfleet Commander
Jump to navigationJump to search
Line 22: Line 22:
  
 
*Do you have sufficient energy to power your mine? You should be over 5k production, as you said. As for the equation, no idea what "floor" means, but here is a Wikipedia article if you feel like figuring it out: http://en.wikipedia.org/wiki/Floor_and_ceiling_functions [[User:48912161|-- jessejericho]] 17:18, 3 March 2010 (UTC)
 
*Do you have sufficient energy to power your mine? You should be over 5k production, as you said. As for the equation, no idea what "floor" means, but here is a Wikipedia article if you feel like figuring it out: http://en.wikipedia.org/wiki/Floor_and_ceiling_functions [[User:48912161|-- jessejericho]] 17:18, 3 March 2010 (UTC)
 +
 +
Should the calculations be built more around marginal ore production?  I.e., expanding from a level 9 to level 10 mine increases your production by 163.  It will take 21 hours for that increase in production to pay for itself.

Revision as of 17:31, 18 April 2010

Is level 40 the maximum level? or can you go higher? Either way I think this should be explicitly noted.

- Does it really matter? by my calculations, with no miners for bonus, it would take 995 days to pay for itself, and even with a full complement of 4% miners it still would take 642 days to pay for itself so I can't see it being too popular. And that's not including the cost of crystal or the cost of power.


Could someone explain the production value equation?

It is given as " floor(30∙X∙1.1X) "

First of all, WHAT is "floor" and secondly, when I punch in a level I get numbers that are way higher than the values in the chart. For example level 20 is:

floor(30∙20∙(1.1*20))

equals "floor(13,200)"

the chart gives a value of 4036. So, "Floor" would have to be < .32 something, to bring it down to the value in the chart. All of the values given other than level 1 are WAY OFF from what I am actually seeing in the game.

The ACTUAL production values I am getting are FAR FAR Lower than the equation *or* the chart. Here is one example of my Ore mines

Colony A, Level 22 Mine with 8 mine droids, my production is 934. Chart says I should have 5,372 and the formula says 13,200 (times 'floor' whatever that is)

Should the calculations be built more around marginal ore production? I.e., expanding from a level 9 to level 10 mine increases your production by 163. It will take 21 hours for that increase in production to pay for itself.